Air-side systems
AHUs, rooftop units, VAV boxes and fan coils: equipment schematics, sensor locations, actuators and control interfaces.
S O L U T I O N SLet’s talk ↗Coordinated drawings, point schedules and wiring details for your BAS project.
Discuss your project ↗
AHUs, rooftop units, VAV boxes and fan coils: equipment schematics, sensor locations, actuators and control interfaces.
Pumps, boilers and chilled-water plant: equipment relationships, control points and packaged-system interfaces.
Controller allocation, terminal references, power requirements and supervisory architecture coordinated with your standards.
A coordinated engineering package with defined interfaces, point requirements, and documented assumptions.
View supported platforms ↗System schematics for AHUs, RTUs, VAVs, FCUs, exhaust systems, pumps, and central plants, coordinated with the approved mechanical design.
Controller layouts, power distribution details, terminal schedules, wiring diagrams, and field-device connection requirements.
Organized hardware and software point lists, units, ranges, naming conventions, alarm requirements, and trend requirements.
Supervisory and controller architecture, BACnet addressing schedules, network segmentation requirements for IT review, and integration boundaries.
Sensor and actuator schedules, controller I/O allocation, equipment interface review, and coordinated technical submittals.
Review comment tracking, drawing revisions, and record updates based on verified field markups and agreed closeout information.
Review project plans and specifications, prepare engineering effort estimates, identify scope gaps, and develop device takeoffs and bills of materials for your bid. Field information is supplied by your local team.
Prepare sizing schedules and selection documentation using the project design flows, pressure requirements, equipment information, and manufacturer data. Record assumptions for design-team review.
A coordinated controls package connects the mechanical intent to the panel, field device and software database. We develop the detail your installation and programming teams need to work from the same information.
Coordinate each point across the equipment schematic, I/O schedule, panel terminal and intended software name. Identify hardware points separately from network values and calculated points.
Record who supplies, wires, programs and verifies each interface. Clarify packaged-unit enable signals, proof contacts, alarms, network maps and read/write boundaries.
Issue a review package with assumptions and open questions. Incorporate agreed comments and verified field changes into the next controlled revision.
Mechanical plans, specifications, and equipment schedules
Existing control drawings and selected controller models
Owner standards, network requirements, and project milestones
File formats, review rounds and final acceptance responsibilities are defined with your team at the start.
Turn the design into a clear sequence ↗JACE and Supervisor architecture, station organization, integration boundaries, and point naming designed for the Niagara project.
Final scope follows the installed version, licensing and approved access.Allocate controller I/O, coordinate panel power and terminal numbers, and connect each device to its drawing reference. Separate JACE/field control from Supervisor aggregation; record station, driver and license dependencies.
Trace a supply-air sensor from the equipment schematic to its input, point name, range and operator value. Alarm destinations, history collection and agreed backup responsibilities.
Illustrative application: A multi-AHU station with a shared Supervisor overview: AHU-01 supply-air temperature. Match source range and signal type before assigning a terminal.
Read the engineering guide ↗Browse AHU, VAV, plant and metering review points ↗
Illustrative record · Match source range and signal type before assigning a terminal.
| Point | Signal | Drawing | Review |
|---|---|---|---|
| AHU01.SAT | AI · °F | M-501 detail 2 | Confirm sensor range |
Use a shared equipment and point schedule as the reference for drawings, I/O allocation and software naming. Review changes against that schedule and track the affected drawing and application revisions together.
Start with the current drawing set, equipment information and known changes. We can define a review, completion or record-update package, with assumptions and field-verification needs identified before production.