
Tridium Niagara 4
- Station architecture and equipment organization
- Wiresheet logic, schedules, alarms, and histories
- Point integration, naming, tagging, and data structure
Scope & compatibility
Niagara Framework connects building systems and operational information. Our scope brings station engineering, integration, graphics, and performance analysis together around your installed environment.
Version, drivers, modules, controller capability, and licensing are confirmed during scoping.
Station structure, integration and operator services.
Coordinate JACE and Supervisor roles with the approved field-control strategy. Our Niagara work package connects point integration, station organization, graphics, alarm configuration and histories to the project sequence.
What we confirm before engineering
- Installed Niagara release, modules, drivers and license capacity
- Equipment hierarchy, point naming, scaling, Fahrenheit units and quality
- Alarm destinations, history collection and agreed backup responsibilities
What the work package can include
- Station and point-mapping structure
- Application review and graphic-binding checks
- Release notes, supported backups and open-item record
Typical application & engineering boundary
A multi-AHU station with a shared Supervisor overview.
Separate JACE/field control from Supervisor aggregation; record station, driver and license dependencies.
Agree the operating sequence and interface map first. Review a representative equipment package before repeating the configuration across the project.
From source data to handover
- Installed Niagara release, modules, drivers and license capacity
- Station and point-mapping structure
- Application review and graphic-binding checks
- Reconcile the released revision, test evidence and unresolved items with the project owner.
Can every connected point be changed?
No. An exposed value may be read-only, calculated or controlled elsewhere. Agree command ownership, permitted writes and local interlocks before including an operator command or supervisory reset.
Separate JACE/field control from Supervisor aggregation; record station, driver and license dependencies.
What determines the final scope?
Installed Niagara release, modules, drivers and license capacity; Equipment hierarchy, point naming, scaling, Fahrenheit units and quality; Alarm destinations, history collection and agreed backup responsibilities. We record access, licensing and version dependencies before committing the work package.










